Factory DirectSupplied from Hubei, China · Compliance certificates and packaging available on request
Supply & Manufacturing

Supply from China to the U.S. & OEM

From specification review to delivery: shipping stages, packaging options, the OEM flow, and customs-support documents for U.S. imports.

Supply Stages

Six Steps from Specification to Delivery

  1. Specification review

    Product, sizes, grades, backing, quantity, and packaging confirmed with the buyer before production.

  2. Production and converting

    Converting follows the approved specification. Typical production time after sample approval: 3–5 weeks.

  3. Packing and preparation

    Industrial or OEM packaging. Standard boxes or custom by agreement. Shipping documents are prepared at this stage.

  4. Ocean / air freight

    Ocean freight to the United States: typically 15–35 days to the West Coast; air freight is faster but costs significantly more. We can arrange shipping on request or ship FOB.

  5. Customs clearance

    The importer provides the domestic import documents (varies by country). We supply COC and COA to support clearance.

  6. Delivery

    Delivery to the port or warehouse under the agreed commercial terms (FOB/CIF/DDP).

Buyer-Brand Manufacturing

A Four-Step OEM Flow

01

Brand files

The buyer sends logo files (vector/AI), packaging artwork, and brand colors.

02

Feasibility review

We review OEM requirements with the production team and identify the impact on MOQ, cost, and lead time.

03

Sample approval

A sample is produced with the requested brand, and the buyer approves it before mass production.

04

Mass production

After approval, mass production starts with the approved brand and packaging.

Packaging Options

Packaging Types Available

FAQ

Questions About Supply and Shipping

What is the total lead time from China to the U.S.?

Production: 3–5 weeks from specification and sample approval. Ocean freight: 15–35 days to the U.S. West Coast. Total: roughly 5–8 weeks. Air freight is faster (3–7 days) but significantly more expensive.

Are a Certificate of Conformity (COC) and Certificate of Analysis (COA) provided?

Yes. We provide COC and COA matching the product specification. Conformity with grit standards (FEPA/ANSI) is declared voluntarily by the manufacturer; import compliance is the importer’s responsibility in the destination country, and we cooperate by arranging the customs-support documents.

Which Incoterms are available?

FOB (on board at Chinese ports), CIF (price + insurance + freight to the destination port), and DDP (delivered duty paid to the importer’s warehouse). We can arrange shipping through our logistics partners or work with the buyer’s designated customs broker.

What is the MOQ for OEM projects?

MOQ is determined case by case by product, customization type, and packaging. MOQs for standard products are lower; OEM with logo-printed packaging carries higher quantities. Please confirm exact figures in the quote.

Request a Quote

Ready to Start a Supply Project?

Send specifications, quantity, destination, and preferred trade terms. We review and reply with a clear commercial quote.